Recap

Nine minutes of downtime, and everything we changed after

Forty people in the Loft on a Tuesday, for an evening about the migration that went long. Three engineers read out what actually happened — the lock, the nine minutes, the two hours of arguing about whether to roll back — and then the room took over, which is the part that always runs late.

What people were building

  • Backend & APIs
  • Data engineering
  • Infra & DevOps
  • RAG & search
  • Security

Who showed up

Lakshmi, Suhas, Manav, Farah, Ritika, Vivek, Sudhir, Chetan, Aryan, Prakash, Neel, Sneha

Three people left with a plan for their own migration and one left with a co-author for the postmortem. #15 is on the calendar; Suhas has agreed to twelve minutes on connection pools, with one graph and no slides.